RRRate Right

01 / The problem

Stop undercharging for your work

Rate Right calculates a fair project price in seconds — real hourly rate, taxes, overhead, and margin included. No signup required.

Calculate my rate

02 / Calculator

Build the number

Software, tools, insurance, accountant, internet, coworking.
Scope creep, an extra round, a file you have to redo.
The part that makes the project worth more than covering costs.
Working weeks
48
Hours / year
1,200
Raw hourly
$40.00

02B / File

Saved quotes

Nothing saved yet. Name the project and save the quote — it survives a refresh.

03 / Three rules

Three things a spreadsheet won’t tell you

  1. 01

    The 40-hour week is a myth

    If your week has 40 hours, 25 of them are billable on a good stretch. The rest goes to email, proposals, meetings, and context-switching. Pricing as if you bill 40 is giving away a third of the year.

  2. 02

    Buffer isn’t greed — it’s survival

    An extra revision round or a scope that stretches shouldn’t eat your margin. A 10–20% contingency is what separates a healthy project from one that puts you in the red.

  3. 03

    Your floor is not negotiable

    Once you know your minimum viable rate, that number is not up for debate. You can cut scope, not price. The client who only picks you because you’re cheapest will not value you later either.